Product Specification
Glove type fitting
For gas system & drinking water
- Cross-cut drawing
- Component
Fitting Assembly Guidelines
Glove packing type fitting for drinking water
- Step 1 : Cut Tube
Cut tube with stainless steel tube at right angle to tube center axis. Make sure the cut end to be clean and flat with no burr.
- Step 2 : Assemble Union Nut
Put union nut onto tube. Make sure the thread side of the nut to face tube-end.
- Step 3 : Put Insulation Ring on Tube
Open wide insulation ring to put on the 3rd valley of tube from cut-end.
- Step 4 : Assemble Glove Packing
Put the glove packing at the end of tube.
- Step 5 : Assemble Socket
Put sealant on tapered thread of socket, then screw the socket into piping system (eg. Tee, Boiler) with high torque using a crescent wrench.
- Step 6 : Assemble Fitting
Put a whole set of tube+insulation+glove packing into tapered hold of socket.
- Step 7 : Tighten Union Nut
Tighten the union nut onto parallel male thread of socket using a crescent wrench with hight torque.
Warning : DO NOT use sealant on parallel thread!Torque
DN15:60kgfㆍcm(5.88Nㆍm)
DN20:72kgfㆍcm(7.0Nㆍm)
DN25:84kgfㆍcm(8.2Nㆍm)