Product Specification
Copper plate type fitting or non-asbestos plate type fitting for gas (For annular coated tube)
- Picture of component
- Cross-cut drawing
- Component & Material
Fitting Assembly Guidelines
Copper plate type fitting or non-asbestos plate type fitting for gas (for annular coated tube)
- Step 1 : Cut Pipe To Length
Cut the pipe to the desired length, leaving 1 inch for placement of the fitting attachment Use stainless steel tube cutter. Clean any jagged edges or burrs.
- Step 2 : Remove Pipe Jacket
Strip the yellow piple jacket back 3~4 valleys from the end of the tubing.Use a utility knife, DO NOT USE A TUBE CUTTER.
- Step 3 : Assemble Flange Nut
Slide Flange Nut over the tubing with the thread end pointing toward the end of tubing. Make sure the flange of the nut to cover the yellow jacket and secure the tubing
- Step 4 : Place Clamp Ring
Open the ring wide enough to fit in the groove behind the first or second ring and use pliers to clamp the brass ring in place. Make sure to put pressure with pliers all 180°around on the ring, so the ring can stay tight and doesn’ t spin around on the tubing.
- Step 5 : Assemble Socket
Put sealing solution on tapered thread of socket. Screw tapered male thread of the socket into female thread of piping systme or boiler, and tighten clockwise with maximum torque using a crescent wrench.
- Step 6 : Get Fitting Ready To Assemble
Make sure a clamp ring & flange nut assembled properly on the tubing, and copper plate stays firmly inside the socket.
- Step 7 : Tighten Up Flange Nut
Put the female parallel thread of the flange nut onto the male parallel thread of the socket. Use a crecsent wrench to tighten up the flange nut clockwise with high torque upto the end of the male parallel thread.Torque
DN15:276kgfㆍcm(27.1Nㆍm)
DN20:420kgfㆍcm(41.41Nㆍm)
DN25:570kgfㆍcm(55.88Nㆍm)
Note : DO NOT USE SEALING SOLUTION ON PARALLEL THREAD
Copper plate type fitting or non-asbestos plate type fitting for gas (for annular non-coated tube)
- Component
- Cross-cut drawing (Non-coated tube)
- Component & Material
- Component and material of Tee socket
Fitting Assembly Guidelines
Copper plate type fitting or non-asbestos plate type fitting for gas (for annular non-coated tube)
- Step 1 : Cut Pipe To Length
Cut the pipe to the desired length, leaving 1 inch for placement of the fitting attachment Use stainless steel tube cutter. Clean any jagged edges or burrs.
- Step 2 : Assemble Nut
Slide Nut over the tubing with the thread end pointing toward the end of tubing.
- Step 3 : Place Clamp Ring
Open the ring wide enough to fit in the groove behind the first or second ring and use pliers to clamp the brass ring in place. Make sure to put pressure with pliers all 180°around on the ring, so the ring can stay tight and doesn’ t spin around on the tubing.
- Step 4 : Assemble Socket
Put sealing solution on tapered thread of socket. Screw tapered male thread of the socket into female thread of piping systme or boiler, and tighten clockwise with maximum torque using a crescent wrench.
- Step 5 : Get Fitting Ready To Assemble
Make sure a clamp ring & flange nut assembled properly on the tubing, and copper plate stays firmly inside the socket.
- Step 6 : Tighten Up The Nut
Put the female parallel thread of the nut onto the male parallel thread of the socket. Use a crecsent wrench to tighten up the nut clockwise with high torque upto the end of the male parallel thread.Torque
DN15:276kgfㆍcm(27.1Nㆍm)
DN20:420kgfㆍcm(41.41Nㆍm)
DN25:570kgfㆍcm(55.88Nㆍm)
Note : DO NOT USE SEALING SOLUTION ON PARALLEL THREAD
Flare low torque cap type fitting for annual non-coated tube
Fitting for Annular Tube for Air Conditioner, Gas, and Water
1.Picture of component
2.Cross-cut drawing
3.Component & Material
- Picture of component
- Component & Material
Fitting Assembly Guidelines
Copper flare cap low torque type fitting for non-coated tube
- Step 1 : Cut Pipe To Length
Cut the pipe to the desired length, leaving 1 inch for placement of the fitting attachment Use stainless steel tube cutter. Clean any jagged edges or burrs.
- Step 2 : Assemble Union Nut
Put union nut onto tube, Make sure the thread side of the nut to face tube-end.
- Step 3 : Put Clamp Ring on Tube
Put clamp ring on the first or second valley of tube. Put pressure on clamp ring 180°around to make sure the clame ring to stay tight and not to spin around on the tube.
- Step 4 : Assemble
Put sealant on taper thread of brass socket then screw the socket into piping system or boiler using a crescent wrench with high torque.
- Step 5 : Assemble Fitting
Make sure union nut & clamp ring assembled properly on tube, and copper flare cap installed in brass socket.
- Step 6 : Tighten The Nut
Use a crecsent wrench to tighten up the nut clockwise with high torque upto the end of the male parallel thread.Torque
DN15:240kgfㆍcm(23.5Nㆍm)
DN20:350kgfㆍcm(34.31Nㆍm)
DN25:550kgfㆍcm(53.92Nㆍm)
Note : DO NOT USE SEALING SOLUTION ON PARALLEL THREAD
Glove type fitting for annular non-coated tube
For gas & drinking water
- Cross-cut drawing
- Component & Material
Fitting Assembly Guidelines
Glove type fitting for annular tube for gas
- Step 1 : Cut Pipe To Length
Cut the pipe to the desired length, leaving 1 inch for placement of the fitting attachment Use stainless steel tube cutter. Clean any jagged edges or burrs.
- Step 2 : Assemble Nut
Put union nut onto tube, Make sure the thread side of the nut to face tube-end.
- Step 3 : Put Insulation Ring on Tube
Open wide insulation ring to put on 3rd valley of tube from cut-end.
- Step 4 : Assemble Glove Packing
Put the glove packing at the end of tube.
- Step 5 : Assemble Socket
Put sealant on tapered thread of socket, then screw the socket into piping system (eg. Tee. Boiler) with high torque using a crescent wrench.
- Step 6 : Assemble Fitting
Put a whole set of tube + insulation ring + glove packing into tapered hole of socket.
- Step 7 : Tighten Nut
Tighten the nut onto parallel male thread of socket using a crescent wrench with high torque.Torque
DN15:60kgfㆍcm(5.88Nㆍm)
DN20:72kgfㆍcm(7.0Nㆍm)
DN25:84kgfㆍcm(8.2Nㆍm)
Note : DO NOT USE SEALING SOLUTION ON PARALLEL THREAD